Highway 12 Project Update
The Highway 12 Litchfield to Cokato resurfacing and concrete repair project has completed Phase 1, and the Phase 1 Litchfield-to-Dassel detour has been removed, according to the Minnesota Department of Transportation. The Highway 12 and Highway 15 intersection has reopened, and the Phase 2 Detour is now in place.
Highway 12 traffic is being detoured from Darwin to Dassel via county roads 14 and 21, and Highway 15. The work zone extends from Litchfield to Cokato and segments of Highway 12 will close during the different phases of construction requiring three separate detours.
Crews are working from Litchfield to Darwin for most of the summer in 2024. Work is taking place under traffic. Use caution and be alert for workers and heavy equipment as Highway 12 is a busy work zone.
The Phase 2 Detour is in place now through October 4th of this year. Highway 12 is closed from Darwin to Dassel. Traffic is detoured to Highway 15 and county roads 14 and 21. Highway 12 will be closed from Dassel to Cokato during construction in 2025 (Phase 3 Detour). Traffic will be routed to Highway 15 and county roads 21 and 3.
During road closures, people who live, work, or visit homes and businesses along the project route will have access to/from Highway 12, usually from the nearest intersection to their location. Expect changes and the use of alternate entrances as work progresses.
In the 2024 project from Litchfield to Dassel, Highway 12 will be resurfaced from Holcombe Avenue in Litchfield to east of Meeker County Road 14 in Darwin. Sidewalks and pedestrian ramps will be upgraded to meet Americans with Disabilities Act standards in Litchfield and Darwin. New sidewalk will be created from Davis Avenue to Hubbard Avenue in Litchfield.
A culvert will be replaced at the county ditch 1.5 miles east of the Highway 12 and Meeker County Road 34 intersection in Litchfield. A pedestrian push button station will be installed at Davis Avenue in Litchfield. The concrete will be repaired, and asphalt shoulders will be replaced on Highway 12 from east of Meeker County Road 14 in Darwin through the Highway 15 intersection in Dassel. The Darwin Rest Stop will be resurfaced, and ADA improvements made to sidewalks.
Duirng the 2025 portion of the project, the concrete will be repaired, and asphalt shoulders will be replaced from east of Highway 15 in Dassel to the end of the concrete section in Cokato. Sidewalks and pedestrian ramps in Dassel will be upgraded to meet ADA standards. Ramps along the trail from Dassel to Cokato will be upgraded to meet ADA standards.